| Vendor Name |
Duration |
Description |
Contract Amount |
| ASIA TIGER, INC DBA ASIA TIGER |
07/19/2007-09/30/2008 |
AGAT SAGAN BISETA BUILDING PROJECT NO.610-5-1118-L-AGT |
449,791.00 |
| BLACK CONSTRUCTION CO |
05/27/2003-09/30/2003 |
AMENDMENT # 4 PROJECT # GU-NH-1000(002) |
694,000.00 |
| BLACK CONSTRUCTION CO |
07/13/2006-09/30/2007 |
COMPLETION OF TRAFFIC MANAGEMENT CENTER PROJECT #GU-NH-1000(016) |
728,000.00 |
| BME & SONS INC |
10/18/2007-09/30/2008 |
TINAGA(PAULILOC)BRIDGE INARAJAN RESTORAT SERVICE DATE 10/18/2007 THRU 9/30/2008 |
152,000.00 |
| BROWN VENCE & ASSOCIATES, INC. |
06/07/2006-09/30/2007 |
ADVISOR FOR CONSTRUCTION OF GUAM'S SOLID WASTE |
250,000.00 |
| BROWN VENCE & ASSOCIATES, INC. |
09/30/2006-09/30/2008 |
SOILD WASTE |
150,000.00 |
| CENTRAL FEDERAL LANDS HIGHWAY |
01/18/2004-09/30/2004 |
TO ESTABLISH ROLES,RESPONSIBILITIES,AND PROCESURES AT WHICH WORK DONE BY CFLHD |
50,000.00 |
| CENTRAL FEDERAL LANDS HIGHWAY |
07/12/2006-09/30/2009 |
1ST AMENDMENT REF:C040601480 DTD 1/18/04 SUPPORT AGREEMENT #X68040009 FOR FLH |
300,000.00 |
| CHB INTERNATIONAL, INC. |
06/16/2008-06/30/2008 |
CHANGE ORDER#1-TO EXTEND SERVICE DATE |
100,000.00 |
| CHB INTERNATIONAL, INC. |
06/16/2008-06/30/2008 |
CHANGE ORDER#1-TO EXTEND SERVICE DATE |
2,546.45 |
| DUENAS, BORDALLO & ASSOC.,INC. |
10/11/2002-09/30/2003 |
GUAM HIGHWAY MASTERPLAN UPDATE PROJECT NO: GU-NH-FY00(001) |
400,000.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
09/30/2003-09/30/2003 |
EARTHQUAKE DAMAGE AND TYPHOON RESTORATIO N |
147,933.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
02/03/2005-09/30/2005 |
1ST AMENDMENT PROJECT NO.DPWSW2004(002) ORIGINAL C040603290 DATED 08/14/05 |
806,054.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
05/18/2005-07/11/2005 |
ROUTE17 REHABILITATION & WIDENING (ROUTE5 TO ROUTE4)PROJECT NO.GUNH0017102 |
424,652.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
05/22/2006-09/30/2008 |
AMENDMENT NO.1-ROUTE 4 REF:C030602750 9/30/2003 |
279,649.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
01/14/2008-09/30/2008 |
|
949,870.00 |
| DUENAS, BORDALLO & ASSOC.,INC. |
04/02/2008-09/30/2009 |
RT10A(AIRPORT RD/CHALAN PASAJEROS RECON) SERVICE DATE 3/26/2008 THRU 9/30/2009 |
239,351.00 |
| E M CHEN & ASSOCIATES INC |
03/20/2006-09/30/2007 |
ROUTE 14B (YPAO ROAD)RECONSTRUCTION AND WIDENING(ROUTE 1 TO ROUTE 14) |
192,761.00 |
| EMPSCO-ENGINEERING |
08/29/2002-09/30/2003 |
ISLANDWIDE HIGHWAY HAZARD ELIMINATION, DESIGN/BUILD PROJ.#GU-NH-HE66(101) |
44,872.00 |
| EVANGELISTA ACABADO ENGR |
04/20/2006-09/30/2006 |
ROUTE 5 AND PORTION OF ROUTE 12 RECONSTRUCTION AND WIDENING |
264,086.00 |
| GEO-ENGINEERING AND |
01/06/2006-09/30/2007 |
MATERIAL SAMPLING & TESTING FATIMA ST RTE16-RTE1 (PROJECT#GUNH027A002) |
150,000.00 |
| GUAM TROPICAL LANDSCAPING |
04/18/2007-09/30/2008 |
INDEPENDENT CONTRACTOR AGREEMENT FOR ROADWAY LANDSCAPING SERVICES |
170,609.36 |
| GUAM VISITORS BUREAU |
09/25/2006-09/30/2006 |
MOU ISLANDWIDE MAINTENANCE OF ROADWAYS ONLY AVAILABLE FUNDS |
76,098.00 |
| HAWAIIAN ROCK PRODUCTS |
12/14/2004-09/30/2005 |
CHANGE ORDER NO. 1 |
53,690.20 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLAND-WIDE POTHOLE REPAIRS, PRIMARY ROADS NOTHERN REGION |
1,047,959.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO. 250-5-1008-HB-TER |
39,500.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
44,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
138,500.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
107,300.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
69,200.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLADWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
102,300.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
1,478,000.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
130,999.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
91,600.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
98,500.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
35,900.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
71,400.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
134,700.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
405,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
366,100.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
194,300.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
33,300.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
100,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
107,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE PROJECT RESTORATION PROJECT NO 250-5-1008-HB-TER |
49,400.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
22,600.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
149,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
149,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
509,800.00 |
| HAWAIIAN ROCK PRODUCTS |
04/18/2006-09/30/2008 |
ISLANDWIDE VILLAGE STREET RESTORATION PROJECT NO 250-5-1008-HB-TER |
41,000.00 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
83,994.24 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
57,491.46 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
44,055.06 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
41,124.70 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
19,145.12 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
65,829.09 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
39,235.68 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
22,396.24 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
136,400.13 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
4,385.92 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
90,472.80 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
62,298.39 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
0.57 |
| HAWAIIAN ROCK PRODUCTS |
05/08/2007-09/30/2008 |
CHANGE ORDER #1A |
0.85 |
| HAWAIIAN ROCK PRODUCTS |
07/06/2007-09/30/2008 |
ROUTE 4 RECONSTRUCTION ROUTE 1 TO MC DONALD PROJECT#GU-NH-0004(108) |
3,079,053.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
32,312.07 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
41,116.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
40,958.39 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
56,580.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
3,600.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
900.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
10,800.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
110,205.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
98,852.16 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#1 |
17,651.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
40,826.16 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
2,700.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
10,215.94 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
450.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
27,388.40 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
900.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
900.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
450.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
1,800.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
450.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
25,400.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
143,184.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
92,178.00 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
88,609.20 |
| HAWAIIAN ROCK PRODUCTS |
05/09/2008-09/30/2008 |
CHANGE ORDER#2 |
66,620.00 |
| HNC ARCHITECT INC |
10/01/1999-12/30/2002 |
DESIGN OF TUMON POLICE PRECINCT FACILITY |
53,000.00 |
| INT'L BRIDGE CORP/NIPPON HODO |
05/28/2004-09/30/2004 |
1ST AMENDMENT RECONSTRUCTION AND WIDENIN G OD ROUTE 4 |
1,400,237.97 |
| INT'L BRIDGE CORP/NIPPON HODO |
05/28/2004-09/30/2004 |
2ND AMENDMENT ROUTE 4 RECONSTRUCTION AND WIDENING |
208,862.30 |
| INT'L BRIDGE CORP/NIPPON HODO |
04/18/2005-09/30/2005 |
CHANGE ORDER NO.4 ROUTE4 RECONSTRUCTION AND WIDENING PROJECT NO. GU-NH-004(101) |
132,143.86 |
| J & B MODERN TECH |
09/21/2006-09/30/2007 |
EMERGENCY GENERATOR/SHELTER AND TANK FOR VARIOUS SCHOOLS |
250,000.00 |
| J & B MODERN TECH |
09/21/2006-09/30/2007 |
EMERGENCY GENERATOR/SHELTERS AND TANK FOR VARIOUS SCHOOLS |
128,415.50 |
| J J JANITORIAL SERVICES |
04/20/2007-09/30/2008 |
INDEPENDENT CONTRACTOR AGREEMENT FOR ROADWAY LANDSCAPING SERVICES |
45,411.21 |
| JESS T LIZAMA & ASSOCIATES,INC |
12/29/2006-09/30/2007 |
AGREEMENT DEVELOPMENT & DESIGN OF HOUSEHOLD HAZARDOUS WASTE COLLECTION |
134,274.00 |
| JMI-EDISON |
05/15/2008-06/30/2008 |
CHANGE ORDER#1-EXTEND SERVICE DATE TO 06/30/08 |
13,543.40 |
| JMI-EDISON |
05/15/2008-06/30/2008 |
CHANGE ORDER#1-EXTEND SERVICE DATE TO 06/30/08 |
30,304.60 |
| JUAN C TENORIO, P.C. |
04/29/2002-09/30/2003 |
ENG SVCS: PROJ#GU-NH-0001(113), DRAINAGE DISPOSAL SYS FOR ROUTE 1(RTE 10A-RTE 16) |
145,200.00 |
| JUAN C TENORIO, P.C. |
08/29/2002-09/30/2003 |
ROUTE 26, TRAFFIC SIGNAL INSTALLATION AT RTE.26/RTE/ 25 INTERSECTION |
35,000.00 |
| JUAN C TENORIO, P.C. |
08/29/2002-09/30/2003 |
ROUTE 3 REHAB. AND WIDENING (ROUTE28 TO RTE.9) DESIGN/BUILD PROJ.#GU-NH-0003(103 |
75,000.00 |
| KINDEN CORPORATION |
09/01/2006-09/30/2007 |
PROJECT#GU-NH-1000(017)ISLAND-WIDE TRAFFIC SIGNAL SYSTEMS REPLACEMENT |
327,068.66 |
| LEDGE LIGHT TECHNOLOGIES INC. |
12/04/2007-09/30/2008 |
1ST AMENDMENT ISLAND WIDE TRAFFIC SAFETY SERVICE DATE 10/02/08 THRU 09/30/08 |
230,000.00 |
| MAEDA PACIFIC CORPORATION |
01/25/2006-09/30/2007 |
RTE3 RECONSTRUCTION AND WIDENING (RTE28-RTE9) Y-SENGSONG ROAD |
5,840,000.00 |
| MAEDA PACIFIC CORPORATION |
03/30/2006-09/30/2015 |
RECONSTRUCTION PF PALE SAN VITORES ROAD TUMON-TAMUNING |
2,000,000.00 |
| MAEDA PACIFIC CORPORATION |
11/17/2006-09/30/2007 |
CHANGE ORDER#2 RT27A(FATIMA STREET) RECONSTRUCTION/WIDENING RT16 TO RT1 |
21,560.00 |
| MAEDA PACIFIC CORPORATION |
08/27/2007-01/30/2008 |
SERVICE DATE 08/27/07 THRU 01/30/08 BRIDGE RESTORATION |
124,000.00 |
| MASOUD AND COMPANY |
11/16/2005-09/30/2007 |
RT2 AGAT-UMATAC ROAD PROJECT NO. GQ-ER-0002(102) LANDSLIDE RESTORATION |
153,700.00 |
| MASOUD AND COMPANY |
09/28/2006-09/30/2007 |
CHANGE ORDER#1 ROUTE 2(AGAT/UMATAC ROAD LANDSLIDE RESTORATION |
141,000.00 |
| PACIFIC SOILS ENGINEERING |
03/07/2002-09/30/2002 |
AMEND-FY2002: PROJ#GU-NH-0001(113) RTE 1 RECONSTR & WIDENING, PHASE I (RTE 10A) |
40,000.00 |
| PARSON'S BRINCKERHOFF INTL INC |
11/27/2007-09/30/2009 |
GUAM TRANSPORTATION PLAN TASK ORDER#1A SERVICE DATE 11/27/2007 THRU 09/30/2009 |
1,396,842.00 |
| PARSON'S BRINCKERHOFF INTL INC |
12/31/2007-09/30/2008 |
GUAM TRANSPORTATION PLAN TASK ORDER#1B SERVICE DATE OCT 01,07 THRU SEPT 30,08 |
5,541,146.00 |
| PARSONS TRANSPORTATION GRP INC |
03/03/2008-02/22/2009 |
4TH AMEND ISLANDWIDE PROGRAM TASK#PTG1 SERVICE DATE MARCH 3,08 THRU FEB 22,2009 |
6,372,969.00 |
| PARSONS TRANSPORTATION GRP INC |
05/22/2008-09/30/2009 |
TASK ORDER#PTG4-ISLANDWIDE MANAGEMENT SERVICES |
455,038.00 |
| PHOENIX PACIFIC (GUAM) INC |
06/23/2008-09/30/2008 |
CHANGE ORDER#1-EXTEND SERVICE & INCREASE CONTRACT AMOUNT |
12,966.41 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INSTALL TYPHOON SHUTTERS(ASTUMBO)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
11,779.62 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INSTALL TYPHOON SHUTTERS(M.ULLOA) SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
10,063.62 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INST TYPHOON SHUTTERS(MACHANANAO)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
5,995.00 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INST TYPHOON SHUTTERS(WETTENGEL)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
11,660.00 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INST TYPHOON SHUTTERS(CARBULLIDO)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
6,708.62 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INSTA TYPHOONSHUTTERS(GWASHINGTON)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
7,442.87 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INSTALL TYPHOON SHUTTERS(UPI)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
12,628.00 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INST TYPHOON SHUTTERS(INARAJAN)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
5,399.62 |
| PREMIER INTERNATIONAL INC. |
12/28/2007-09/30/2008 |
INSTALL TYPHOON SHUTTERS(MERIZO)SCHOOL SERVICE DATE OCT 1,07 THRU SEPT 30,08 |
5,995.00 |
| REX INTERNATIONAL INC |
05/30/2003-09/30/2003 |
AMENDMENT #1 EMERGENCY PERMANENT RESTORA TION OF TRAFFIC SIGNS |
182,797.00 |
| SERISOLA & ASSOCIATES, INC |
03/13/2006-09/30/2007 |
ROUTE 26 RECONSTRUCTION AND WIDENING (ROUTE 1 TO ROUTE 15) |
192,839.00 |
| SERVICEMASTER GUAM INC. |
04/18/2007-09/30/2008 |
INDEPENDENT CONTRACTOR AGREEMENT FOR ROADWAY LANDSCAPING SERVICES |
62,451.82 |
| SERVICEMASTER GUAM INC. |
07/10/2008-09/30/2008 |
AMENDMENT#1 LANDSCAPING/MAINTENANCE SERVICE DATE OCT 1,07 THRU SEPT 30,2008 |
32,650.91 |
| SHAW ENVIRONMENTAL AND |
02/14/2007-09/30/2009 |
2 YEAR CONTRACT CONSENT DECREE PROJECT NEW MUNICIPAL SOLID WASTE LANDFILL |
237,772.00 |
| SHAW ENVIRONMENTAL AND |
03/25/2008-09/30/2008 |
AMEND#1 CONSENT DECREE PROJECT LANDFILL SERVICE DATE MARCH 25,08 THRU SEPT 30,08 |
30,000.00 |
| TELEGUAM HOLDINGS, LLC |
06/23/2003-09/30/2005 |
MOU DPE/GTA ROUTE4 RECONST. & WIDENING YONA TO YLIG BRIDGE PJ#GU-NH-0004 |
795,928.00 |
| TG ENGINEERS, PC |
08/09/2005-07/11/2006 |
ROUTE25(ALAGETA STREET)RECONSTRUCTION/ WIDENING(ROUTE26 TO NEW BELLO ROAD) |
170,038.00 |
| TG ENGINEERS, PC |
05/25/2006-09/30/2006 |
ORDOT DUMP CLOSURE |
79,496.00 |
| TG ENGINEERS, PC |
06/12/2006-12/31/2011 |
1ST AMENDMENT RT25 & RT26 TO NEW BELLO ROAD |
77,936.00 |
| TG ENGINEERS, PC |
06/13/2006-09/30/2006 |
3RD AMENDMENT NEW SOLID WASTE LANDFILL |
1,562,096.00 |
| TG ENGINEERS, PC |
07/31/2006-09/30/2006 |
AMEND #4 RIGHT-OF-WAY/ACCESS ROAD NEW MUNICIPAL SOLID WASTE LANDFILL |
64,968.00 |
| TG ENGINEERS, PC |
09/13/2006-09/30/2007 |
AMENDMENT#5 NEW MUNICIPAL SOLID WASTE LANDFILL FIELDWORK MODEL/REPORT |
76,178.00 |
| TG ENGINEERS, PC |
09/13/2006-09/30/2007 |
AMENDMENT#5 NEW MUNICIPAL SOLID WASTE LANDFILL FIELDWORK MODEL/REPORT |
1,500,000.00 |
| TG ENGINEERS, PC |
03/27/2007-09/30/2008 |
ENVIRONMENTAL & ENGINEERING SVC FOR THE DESIGN OF NEW SOLID WASTE LANDFILL |
790,348.00 |
| TRIPLE TECH INCORPORATED |
09/30/2003-09/30/2004 |
CONSTRUCTION OF TUMON POLICE PRECINT |
38,953.50 |
| UNIVERSITY OF GUAM |
08/11/2006-09/30/2006 |
MOA FORMAL SEATBELT/CHILD RESTRAINT SURVEY |
4,900.00 |
| US ARMY CORPS OF ENGINEERS |
05/09/2003-09/30/2003 |
VARIOUS SHORELINE PROTECTION PROJECTS |
1,695,000.00 |
| US ARMY CORPS OF ENGINEERS |
05/09/2003-09/30/2003 |
VARIOUS SHORELINE PROTECTION PROJECTS |
1,647,000.00 |
| US ARMY CORPS OF ENGINEERS |
01/20/2004-09/30/2004 |
RE CERTIFICATION OF FUNDS |
12,000.00 |
| W B FLORES & COMPANY |
08/28/2002-09/30/2004 |
TUMON BAY INFRASTRUCTURE AND BEAUTIFICAT ION PROJECT |
117,103.73 |
| WINZLER AND KELLY |
06/03/2004-09/30/2004 |
REPLACEMENT OF AGFAYAN BRIDGE |
85,499.20 |
| WINZLER AND KELLY |
07/03/2007-09/30/2008 |
1ST AMENDMENT DESIGN REPLACEMENT OF AGAFAYAN BRIDGE PROJECT#GQER0004/017/113 |
121,354.73 |
| DEPARTMENT OF PUBLIC WORKS TOTALS: |
52,420,715.73 |
|